Progressive Energy, 55MW

Location:
Honduras, Central America

 

Description:
Members of IPM participated in the direction of the assembly of:
The turnkey project located in Choloma, Honduras, for a 54.8 MW Power Plant with 3 Gen-Sets (3 X 18V51/60), under one EPC contract, (Engineering, Procurement and Construction). 


The works included: Civil Works and Mechanical Works, design and mechanical and electromechanical installations, special systems for the installation of generation engines.

Termopuerto, 72MW

Termopuerto, 72MW

Power generation plant, 72MW with 4 diesel engines 18V48/60-MAN
Ingenio La Gloria, 45MW

Ingenio La Gloria, 45MW

Boiler 1X200TPH/87BAR/540 grades C, Pinhole Grate, under a contract for civ...
GECSA, 35MW

GECSA, 35MW

Power Plant with 2 Diesel Gen-Sets (2 X 18V48/60), under an EPC (Engineerin...