HGPC, 43MW

Location:

Honduras, Central America

 

Description:

Project located in Choloma, Honduras, for a 43MW Power Plant, IPM members participated in the management of:

Boiler 1X160TPH/86.2BAR/540 grades C, traveling grill, under a contract for civil work, electrical, instrumentation and commissioning.

Powerhouse: Shin Turbines Nippon and BRUSH generator, extraction, and condensation; mechanical and electrical assembly, instrumentation, and commissioning.

GECSA, 35MW

GECSA, 35MW

Power Plant with 2 Diesel Gen-Sets (2 X 18V48/60), under an EPC (Engineerin...
CASUR Sugar Mill, 40MW

CASUR Sugar Mill, 40MW

Boiler 1X170TPH/86.2BAR/540 0 C traveling grille, under a contract for mech...
SAN PEDRO THERMAL POWER PLANT 240MW

SAN PEDRO THERMAL POWER PLANT 240MW

Electromechanical works of the 3NEM HRSG x 1 SIEMENS (SST600)